MARSYA Water Injection Facility
Longitude were contracted by SAJ Tech to provide detailed engineering associated with conversion of Halcyon 2 MODU to a Water Injection Facility. Facts and Figures: 3500tons topside’s elevated weight 40m…
ABL Group is a leading global independent provider of energy, marine and engineering consultancy solutions working in energy and oceans to de-risk and drive sustainability across renewables, maritime and oil and gas sectors. Based in more than 300 locations worldwide, ABL Group consists of the following companies.
Longitude were contracted by SAJ Tech to provide detailed engineering associated with conversion of Halcyon 2 MODU to a Water Injection Facility. Facts and Figures: 3500tons topside’s elevated weight 40m…
Longitude are actively working with suppliers and geotechnical consultancies to investigate the loads and behaviour of shared mooring foundations for floating wind arrays. Building on existing research with single floating…
Sector: Renewables
Longitude together with LOC have commissioned a study into the design and specification of mooring systems for semi-submersible floating wind turbines. The first phase of this study initially concentrated on…
Longitude were contracted by BW Offshore to provide the engineering service (Pre-Sanction Stage) based on BWO’s Singapore office for the conversion of a FSO unit (Floating Production Unit) “Belokamenka”…
Longitude were contracted by GPS to provide detailed engineering associated with decommissioning of Cendor MOPU Producer, offshore Malaysia. Facts and Figures: 3200tons topside’s elevated weight 63m Water depth Mat supported…
Longitude were contracted by SAJ Tech to provide detailed engineering associated with conversion of Halcyon 2 MODU to a Water Injection Facility Facts and Figures: 3500tons topside’s elevated weight Mat…
Longitude was contracted by Kencana HL Sdn Bhd to provide the detailed engineering associated with the conversion of a MODU to self-elevating accommodation rig. The scope was also inclusive…
Longitude were contracted by Petrofac RNZ and Petronas to provide the full range of naval architecture and structural engineering service for the FEED study of MOPU Saparmyrat Turkmenbashi and…
The CENDOR MOPU PRODUCER was installed in Cendor field in 2006 to produce from the field until such time as further field infrastructure is installed and decommissioned. It is…
Longitude was contracted by MRTS to provide design engineering for the sea fastening of JASCON 18 ’s Stinger sections and Crane Masthead for transportation onboard the same vessel. Facts and…